Gara Herăstrău

Gara Herăstrău

Works start on Gara Herastrau, a project owned by Globalworth, one of the most important investors in Romania. This new project, coordinated by the prestigious design company Westfourth Architecture, comprises over 5500 square meters of classic curtain walls, over 1000 square meters of ventilated façades with Reynodual aluminum panels, 300 square meters of ventilated façades […]

Bucharest One

Bucharest One

The assembly of the unitised curtain walls has reached the last floor, and we will continue until the end of the year with the closure of the technical floor (attic). We continue with mounting the classic PC structure of the interior balconies and installing fire resistant interior doors. Also, Reynodual Composite Aluminum Coating Structure has […]

UBC 05 Iași

UBC 05 Iași

In mid-October, the building for UBC-06 – the former Palas cinema, has started. This is in the process of being transformed into an office building. Like her older sister, UBC – 05 for UBC – 06, the same façade system was chosen. The major differences are represented by the type of fastening of the facade […]

UBC 05 Iași

UBC 05 Iași

The works for the UBC 05 Iasi project started after a period of about a month that consisted in the preparation of the workshop and the elements to be assembled from Iasi. The date of August 26, 2015 marked the beginning of the building envelope, as the first unit was installed. The work is expected […]

Bucharest One

Bucharest One

On body B began assembly of the wood paneling, ass well as of the structure for plating with Reynodual composite aluminum plates, both on the body A and on the body B. This continues with the fitting of the pre-frames and the door and exterior window frames, following the finishing the classic curtain walls, including […]