On Building B, the installation of the louvers has begun, along with the support structure for the Reynodual aluminum composite cladding on both Building A and Building B. Work continues with the installation of subframes and exterior door and window frames, moving towards the completion of the classic system curtain walls, including the closures for Building B. Additionally, the installation of the classic system curtain walls has commenced on the lower floors (mezzanine and 1st floor) of Building A.