The installation of the unitized curtain walls has reached the top floor, with work to continue through the end of the year to enclose the technical floor (parapet/attic). We are proceeding with the installation of the classic curtain wall structure for the interior balconies and the mounting of fire-rated interior doors. Additionally, the installation of the support structure for the Reynodual aluminum composite cladding has begun on the lower floors (mezzanine and 1st floor). The NE-NW facade of Building B (Mega Image) has been completed, including: louvers and sills, Reynodual aluminum composite cassettes, lower-level flashing, and aluminum profile door trims.